When a panel upgrade makes sense
A panel upgrade is about capacity and condition, not age alone. These are the reasons we see most in Markham homes:
- No room for new circuits for a renovation, a basement suite, a hot tub or an EV charger.
- A 100 A service that cannot carry a heat pump, induction range and charger together on paper.
- Breakers that trip when large loads overlap, or tandem breakers added to squeeze in circuits.
- Heat marks, corrosion or loose connections found with the cover off.
Panel or service?
A panel replacement swaps the box and breakers. A service upgrade also raises the amperage coming into the house, with a new meter base and the utility’s involvement.

What a 100 A to 200 A upgrade involves
The order is the same on most Markham houses:
- Load calculation. We size the service to what you have and what you plan to add, using the Ontario Electrical Safety Code calculation.
- ESA notification. The work is filed with the Electrical Safety Authority before it starts.
- Alectra scheduling. Alectra Utilities disconnects and reconnects the service, so the date is set around their crew.
- Replacement. New meter base where needed, new panel and main breaker, every circuit reconnected and labelled.
- Inspection and power back on. ESA inspects, Alectra reconnects and we check every circuit before we leave.
Cornell, Box Grove and older Markham
Many Cornell homes have a detached garage on the rear lane, so a panel upgrade is often planned together with a feeder to the garage for a charger or a workshop. Sizing both at once avoids paying for the trench twice.
Older houses around Markham Village and Mount Joy are more likely to have a 100 A service and a panel that has been added to over the years. There the upgrade usually includes tidying circuits that were tapped together.
If the plan includes an EV charger, read the EV charger page first: load management can sometimes avoid the service upgrade entirely.
What changes the price
- Whether it is a panel replacement or a full service upgrade with a new meter base.
- Overhead or underground service entry.
- How many circuits need extending or correcting to reach the new panel.
- Drywall or finished ceilings around the panel location.
Questions we get
How long is the power off?
Usually most of a working day on a service upgrade. The utility disconnects in the morning and reconnects after the inspection.
Will a new panel fix flickering lights?
Only if the cause is at the panel. Loose connections elsewhere need their own repair, and we check for them during the visit.
Can the panel be moved?
Sometimes. It means extending every circuit to the new location, so it is usually done during a renovation.
Thinking about a panel upgrade?
Tell us the service size if you know it, what you are adding, and send a photo of the panel with the door open. We will tell you whether a replacement or a full service upgrade fits.